The 140-meter hull of the self-propelled loader vessel of the P-140 “NIBULON MAX” project was launched at the Nibulon shipyard in the city of Mykolaiv on May 22, the general director of the “Nibulon” company, Oleksiy Vadaturskiy, reported on Facebook.
According to Vadaturskiy, this project has become the most difficult in its practice, and the vessel itself has the longest hull in the history of independent Ukraine.
The report notes that the ship became the 75th in “Nibulon’s fleet”; it will be put into operation on September 20 of the current year.
As The Journalist reported, the construction of a two-hold dry Grain-3 cargo barge completed in Odesa Oblast
Подписывайтесь на telegram-канал journalist.today