The Ukrainian side of the Joint Center for Control and Coordination (JCCC) on ceasefire and stabilization of the demarcation line continues to timely and efficiently carry out measures aimed at restoring the damaged infrastructure of Donbass. This was reported by the press center of the Ministry of Defense.
In particular, with the assistance of the Joint Forces Command, the Ukrainian side of the JCCC, together with the OSCE SMM patrols, ensure control of security guarantees and compliance with the ceasefire regime during the work indicated below.
Thus, construction work continues on the restoration of the bridge across the railroad tracks of the Kharkiv-Debaltsevo highway. Within a week, concrete-poured metal structures were installed in the prepared wells of the future bearing piles of the bridge. The demining group of the State Emergencies Service of Ukraine examined the roadside adjacent to the bridge. Also, during the execution of the work, the remains of the concrete blocks of the old bridge destroyed as a result of the hostilities of 2014 are removed. The work is being carried out according to the plan and on time.
Particular attention is paid to Zolote and Schastya checkpoints, where construction work is being completed. In particular, a bus stop was installed at the Schastya checkpoint. In the area of the Zolote checkpoint, the employees of the Lisychansk district agency of automobile roads cleared the roadside from bushes, branches, repaired the barrier and cable fencing, and painted cities.
Подписывайтесь на telegram-канал journalist.today