Ministry of Infrastructure signs contract for construction of airfield in Dnipro

31
Open source

The Ministry of Infrastructure has signed an agreement with the general contractor for the construction of a new airfield complex at Dnipro International Airport. According to the results of the tender, Altis-Construction LLC became the general contractor, the press service of the department reported.

According to the agreement, the company undertakes to carry out work on the construction of the airfield for UAH 3.95 billion. Before the start of the auction, the expected cost of the work was UAH 5.7 billion (+ 30%). The last phase of the construction of the airfield should be completed by December 2023.

Подписывайтесь на telegram-канал journalist.today